Project Overview
Our expert plumbing team executed complete water and drainage line installations for bathrooms, kitchens, and utility areas. The work included concealed CPVC piping, high-pressure testing, and installation of branded sanitary fittings for a reliable long-term solution.
Project TypeVilla Renovation Plumbing System
Pipe MaterialCPVC & PPR Hot/Cold Lines
FittingsGrohe, Geberit, RAK Ceramics
Scope of Work
1) Plumbing Installations
Installed new hot and cold water lines using PPR pipes.
Pressure-tested all joints and concealed pipework before finishing.
2) Drainage & Waste Systems
Installed complete PVC drainage and vent lines.
Fitted floor traps, cleanouts, and slope testing for proper flow.
3) Sanitary Fixtures Installation
Mounted wall-hung WC, basins, mixers, and shower sets.
Used Grohe and RAK fixtures for premium finish.
4) Water Heater & Filtration
Installed Ariston water heater with safety valve.
Added main water filter for clean water supply.
5) Testing & Commissioning
Performed water leakage and pressure test on all lines.
Ensured final inspection and DM compliance before handover.
Materials & Brands Used
Grohe mixers & sanitary fittings
Geberit concealed cisterns
Challenges & Solutions
Concealed layout conflicts: Coordinated closely with MEP and civil teams to avoid rework.
Low water pressure issue: Installed booster pump to ensure stable water flow throughout villa.
Timeline & Deliverables
Estimated Duration2 Weeks
DeliverablesFully installed plumbing & sanitary system
HandoverInspection & pressure test certificates
Client Testimonial
“Professional and clean work by Al Arsh Technical Services — no leaks, no rework, everything done perfectly.” — Villa Owner, Dubai
About Al Arsh Technical Services
Al Arsh Technical Services provides expert plumbing, sanitary, and mechanical installation services across Dubai.
We handle both residential and commercial projects with high-quality materials and skilled technicians.